Makua Kane Dave
3/2017 made ama holders, iako covers, ama covers
5/2015 made stubby iako
Kai Malama Keiki
3/2017 made ama holders, iako covers, ama covers
5/2015 made stubby iako
8/2017 – New pump and battery holder
Kāholo
9/2015 – seat pads installed
4/2016 – added weight hangers
6/2016 – new spray skirt
9/2016 – Elkhorn Composites repair of Tony Gora damage, front manu defect, and widened seats 1,6
12/2016 – fixed a few ama gel coat dings
4/2018 – iako refinished
Kananimauloa
6/2015 Ding under ama repaired by Homer
8/2017 Repaired broken peg in read iako, touched up varnish
3/2018 – Elkhorn Composites many gel coat fixes
Lapa Uila
5/2015 – Rear plug riveted back on. Ama plug replaced.
4/2016 – refinished iakos
4/2016 – added weight hangers
8/2017 – replaced missing? weight hanger and re-installed weight.
8/2017 fixed gel coat ding in front and small crack under front
3/2018 – Elkhorn Composites fixed worn through gunnels inside seat six, many gel coat fixes
42018 – all seat pads replaced
Makani Akua
5/2015 – Deck plate O-rings replaced and deck plates siliconed.
7/2916 – Elkhorn Composites repaired damage from hitting jetty
12/2016 – fixed a few ama gel coat dings
2/2018 – refinished iako
Bruddah Nappy
2/2016 – Painted Mike Ng Mike Martinez
Ho’o Maikai
2/2016 – Painted Mike Ng Mike Martinez
4/2016 – Elkhorn Composites repaired damage from towing back into harbor
6/2017 – Homer Lighthall repaired seats separated from gunnals
Maka Nui
5/2015 – Deck plate O-rings replaced and deck plates siliconed.
7/2016 – New seat foam
12/2016 – fixed a few ama gel coat dings
8/2017 – restored front iako
OC1 Blue
2/2015 – New deck chocks built. Bailer venturi replaced
3/2015 – Rudder replaced
11/2015 – new ama and iako
12/2015 – fixed gel coat ding in front
3/2016 – epoxied bungie holder
1/15/2018 – ama replaced
OC1 Red
10/1/2017 Donated by Amy Culver
10/15/2017 New drain plugs, kelp guard, bailers
10/20/2018 New steering cables
1/1/2018 Additional ama rack installed
3/2018 Crack repaired by Huki
OC2
6/2015 – replaced. New deck chocks built.
7/2015 – deck box built
4/2018 – ama fixed, bolts re-enforced, new gel coat at bolts and in front
Trailer
5/2015 – New yellow straps. New orange straps.
6/2015 – Replaced missing nut on large rear cradle bolt.
8/2015 – Brakes serviced, new wheel jack installed
3/2016 – New trailer purchased, repaired wire harness
7/2016 – Ramps created
9/2016 – top row blocks cut risers installed and extra bolts added. Extra yellow straps.
12/2016 – new trailer box, replaced rubber pads on tie downs.
Dollies
10/2014 – Seitech dollies repaired – new tires on one, new axle housings and retainer rings on all three.
2/2015 – New Low Rider bought
10/2015 – new tires on 2nd Seitech
3/206 – replaced broken seittech upright bracket
10/2016 – made new pair of PVC cradles
11/2016 – replaced bearings on two oldest big foots. Replaced padding on oldest.
7/2017 – made new pair PVC cradles, modded pair for unlimiteds
8/2017 – added padding to two big foots. Added pad to trailer pair.
12/2017 – Rich welded one Seitech axle. Replaced axle holders on another. Added shims to all 3.